In September 2017, Irma and Maria passed the Virgin Islands at Category 5 strength, and the President declared major disasters for them 13 days apart. Lives were lost, more than half the Territory’s homes were damaged, and power and phones were out for months. For government systems, one lesson comes first: a second storm can arrive before recovery from the first is finished.
The season runs to November 30, but the National Hurricane Center puts its peak at September 10. That leaves November to fund the work, December through May to do it, and June 1 as the deadline.
What 2017 taught Territory IT
The Territory’s Hurricane Recovery and Resilience Task Force wrote its lessons down plainly. The government phone system went out of service, some government data was lost to server damage, and connectivity problems disrupted medical and food assistance programs.
The Task Force reported that many agencies ran critical applications on Bureau of Information Technology (BIT) servers on St. Croix. The storage system was taken offline before the storm to protect it, and files were corrupted when services were restored. Many standby generators supporting it, meant to run for hours or days, failed after running for more than three months. BIT restored some critical applications from cloud storage, but as of May 2018 data on the damaged drives had not been recovered. For any team, shutdown and restart are procedures, and procedures can be rehearsed.
Licensing and property registration were unavailable for weeks, if not months, partly because much of the data was stored only locally. The Task Force recommended cloud as primary storage and hardware as backup, giving at least two ways to recover data. That is still a fair test: if the building is lost, where is the second copy?
The Task Force also found that backup power at telecom sites is typically meant to last only up to 96 to 120 hours, four to five days. WAPA told GAO that restoring power to all eligible customers took roughly five months. Backup sized for days faced an outage that lasted months.
Move critical systems off-island
The fix is to take the on-island server room, and its generator, out of the chain public services depend on. Start with what FEMA’s continuity guidance calls essential functions: those that must continue regardless of conditions. For many agencies, that means benefits, payments, licensing and records.
Put the alternate site where the same storm is unlikely to reach, as NIST’s contingency planning guide advises: for the Virgin Islands, the mainland. We use two mainland cloud regions on whichever provider fits, such as AWS’s Northern Virginia and Ohio, or government cloud regions where compliance requires them.
One region can be disrupted too, as AWS’s Northern Virginia region was for more than 14 hours in October 2025. Two regions do not promise zero downtime. They guard against a storm here and an outage there, if recovery is built in advance and needs no DNS or access changes from systems that run in one region.
The Task Force reported that undersea cables carried roughly 99% of the Territory’s data traffic off-island. In 2017, it found, the offshore cables were mostly untouched and the landing stations’ backup power held. Most of their loss of service was not caused by the storms: crews setting new poles during restoration damaged buried cable and cut access to the stations. Because most switching happens off-island, that severely limited internet and cellular providers alike.
Moving systems to the mainland makes those links matter more. Each essential service needs a reduced mode: offices that keep taking applications and queue them until links return, a local copy of the records staff use most, and another path to the mainland, such as a second carrier or cellular for a local fiber cut, or satellite, at far lower capacity, if the cable links are down.
Backups for storms and intrusions alike
It does not take a major hurricane. In August 2024, WAPA said flooding during Tropical Storm Ernesto stopped generation at its Richmond plant, blacking out St. Croix. Nor does it take a storm. A network breach can take an agency’s network and landlines down on every island at once, even while 911 keeps running.
Off-island systems ride out a grid failure. Backups must also survive an intruder, and ransomware is the case to design for: CISA warns that most ransomware actors try to find and delete or encrypt the backups they can reach.
CISA’s backup guidance for state, local, tribal and territorial governments calls for three copies on two kinds of storage, one of them off-site, plus offline copies and at least seven days of rollback. We add a write-once copy with a locked retention period, set so stolen administrator credentials cannot alter or delete it before the period ends, kept in a separate, locked-down account. CISA urges caution with such immutable storage, which does not meet some compliance rules and is costly to misconfigure, so we set retention deliberately. Its performance goals add yearly recovery tests and checking backups for compromise before restoring.
After a declared disaster, FEMA’s Public Assistance guide lists recovering data from water-damaged drives as eligible work, but not re-entering lost data or building new databases. None of that replaces an off-island copy.
Rehearse in the quiet months
NIST scales exercises to a system’s impact: a tabletop for low, a restore from backup for moderate, and a full failover for high. Its sample policy calls for testing every year. It also says recovery staff should be able to work without the plan document, which may be unavailable in the first hours.
For a two-person team, that means people who have run the steps before, short printed runbooks by role, recovery resources built in advance, and reserve emergency administrator accounts. An illustrative calendar:
- November. Line up funding and start any procurement.
- December and January. List essential functions and their systems. Set how fast each must return and how much data it can lose.
- February and March. Begin moving critical workloads and backups off-island. Run a tabletop.
- April. Restore a moderate-impact system from backup, end to end.
- May. Fail the highest-impact systems over to the second region and back.
- After each exercise. Record what broke and track every fix to completion.
Paying for it
Continuity has a cost, and part of it may be recoverable. Under 2 CFR Part 200, a share of central IT costs can reach federal programs through an approved central service cost allocation plan, which covers both costs allocated on a reasonable basis and costs billed to programs through usage-based rates. Costs must be allowable, allocable, reasonable and documented, and costs left out of the plan are not reimbursed. Cloud spend tagged by program and metered by use can supply the usage evidence. That helps recover a fair share of costs already paid. It is not new money.
Grant programs vary, and several are in flux. As of October 24, 2026:
- FEMA’s Hazard Mitigation Grant Program follows presidential major disaster declarations, requires a FEMA-approved mitigation plan, and suits backup power better than cloud services. The Congressional Research Service found it was not approved for any new declaration from March 2025 into January 2026, and FEMA has declined some statewide requests in 2026.
- FEMA’s Building Resilient Infrastructure and Communities program, ended in 2025 and resumed under a court order, stopped taking applications for its combined 2024 and 2025 round on July 23, 2026. Selections are pending; no later round has been announced.
- The State and Local Cybersecurity Grant Program’s authorization lapsed again on September 30, 2026, so check its status before counting on it. Fiscal 2025 awards have a performance period through August 2029.
- Federal agencies must waive local match requirements under $200,000 for the Virgin Islands and may waive larger ones, though program statutes can differ.
This is general information, not legal or accounting advice, and it promises no funding. The funding agency decides eligibility and awards. Coordinate with your finance office and cognizant federal agency.
Where to start
Before June 1, do two things. First, a combined cost and security assessment, since one inventory answers both: where your IT money goes, where your exposure is, and which systems still depend on an on-island server room. Second, a failover drill on the calendar, run by the people who would run it in September.